POST TENSIONED ENGINEERING CORP. AND COMMERCIAL CONSTRUCTION CORP., PETITIONERS,
v.
FAIRWAYS PLAZA ASSOCIATES, RESPONDENT

Fla. 3d DCA | 1983-03-01
Nos. 81-2473, 81-2604
Before SCHWARTZ, C.J., and DANIEL S. PEARSON and JORGENSON, JJ.
429 So. 2d 1212 Florida District Court of Appeal, Third District (1983) Positive Treatment
Cited by 23 cases

AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.

Synopsis

Commercial Construction Corp. sought review of a trial court order lifting a stay of proceedings against non-arbitrating defendants. The Third District Court of Appeal held that while litigation against the design engineer could proceed, litigation against Commercial's subcontractors must be stayed pending arbitration between Fairways and Commercial, because the arbitrable issue (Commercial's negligence) was not severable from the issue of subcontractor liability.


Holding

The court held that the stay must be reinstated as to Commercial's subcontractors because the arbitrable issue (Commercial's negligence) is inseparable from the subcontractors' liability, but the stay was properly lifted as to the design engineer because that issue is severable from the arbitration between Fairways and Commercial.


Headnotes

[1] A stay of litigation is required when an issue subject to arbitration is not severable from the issues in the litigation.

[2] A party to a contract with an arbitration clause cannot avoid arbitration by joining parties with whom there is no arbitration agreement.

Previewing 2 of 6 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.

Join FLexlaw to unlock all legal intelligence

Key Quotes

“Any action or proceeding involving an issue subject to arbitration under this law shall be stayed if an order for arbitration or an application therefor has been made under this section or, if the issue is severable, the stay may be with respect thereto only.”

States the statutory requirement that proceedings involving arbitrable issues must be stayed, subject to a severability exception.

Previewing 1 of 3 key quotes on this case — the court’s exact language, pinpointed for members.

Join FLexlaw to unlock all legal intelligence

Facts & Procedural History

Fairways Plaza Associates owned an office building project and sued its design engineer, general contractor Commercial Construction Corp., and certain…

The full statement of facts, procedural history, and disposition for this case are member content.

Join FLexlaw to unlock all legal intelligence

© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.


Opinion of the Court
DANIEL S. PEARSON, Judge.

DANIEL S. PEARSON, Judge.

Fairways Plaza Associates, the owner of a multiple office building project, sued its design engineer (C.A.L. Engineering Corp.), its general contractor (Commercial Construction Corp.), and certain subcontractors of Commercial. Fairways alleged that it had discovered severe and widespread structural defects in the construction of the buildings which, Fairways contended, were caused by the negligence of the defendants.

Of the multiple contracts involved, only Fairways’ contract with Commercial contained an arbitration clause. When this case was first before us, we rejected Fairways’ various arguments in opposition to arbitration and held that the arbitration clause was valid and enforceable and that Commercial had not waived its right to demand arbitration. See Post Tensioned Engineering Corp. v. Fairways Plaza Associates, 412 So. 2d 871 (Fla. 3d DCA), rev. denied, 419 So. 2d 1197 (Fla.1982). Upon remand of the case to the Circuit Court, Fairways, over the objection of Commercial Construction Corp., persuaded the trial court that litigation between Fairways and the other defendants, with which Fairways was not bound to arbitrate, should go for ward.1 Commercial, contending that all trial court proceedings should be stayed pending arbitration of the dispute between it and Fairways, seeks review of that order.2

Commercial maintains that a stay is required by Section 682.03(3), Florida Statutes (1981). That section provides:

“Any action or proceeding involving an issue subject to arbitration under this law shall be stayed if an order for arbitration or an application therefor has been made under this section or, if the issue is sever-able, the stay may be with respect thereto only. When the application is made in such action or proceeding, the order for arbitration shall include such stay.” (emphasis added).

The “issue subject to arbitration” between Fairways and Commercial is whether the building defects, assuming they exist, are the result of shoddy workmanship on the part of Commercial or its subcontractors, that is, a failure to adhere to the design engineer’s plans and specifications. Because Commercial, under the doctrine of respondeat superior, is responsible for the negligence of its subcontractors, a determination in arbitration that Commercial was not negligent would necessarily be a determination that Commercial’s subcontractors were not negligent. Under such a determination any need for litigation between Fairways and Commercial’s subcontractors would be obviated. Therefore, we think it clear that Fairways’ action against Commercial’s subcontractors does involve “an issue subject to arbitration” and must be stayed. Even as “a party to a contract calling for arbitration may [not] avoid that undertaking by the simple device of joining as defendants in its lawsuit others with which the party has no such agreement,” Post Tensioned Engineering Corp. v. Fairways Plaza Associates, 412 So. 2d at 875, a party to a contract calling for arbitration may not, by that same device, defeat the right of the other party to the contract to obtain a stay of all proceedings involving the arbitrable issue. See Lake Beech wood Country Club, Inc. v. Peekskill Manor, Inc., 2 A.D.2d 865, 156 N.Y.S.2d 176 (1956); Dot’s Boulevard Corporation v. Rosenfeld, 285 A.D. 425, 137 N.Y.S.2d 470 (1955); Flash v. Goldman, 278 A.D. 829, 104 N.Y. S.2d 297 (1951); Cold Wave Cooling Corp. v. Famous Jerome, Inc., 141 N.Y.S.2d 898 (N.Y.Sup.Ct.1955).

Fairways argues that Schulman Investment Co. v. Olin Corp., 458 F.Supp. 186 (S.D.N.Y.1978), decided under the Federal Arbitration Code’s counterpart to Section 682.03(3),3 requires that any stay of trial proceedings be limited to the arbitrating parties. In Schulman, the defendant contractor (Olin) brought a third-party complaint against three of its subcontractors, including H & H. The contract between Olin and H & H included an arbitration clause, and H & H moved for an order staying the action pending arbitration. The court granted the stay, but only as to Olin’s third-party complaint against H & H.

Schulman is not only distinguishable from the present case, but indeed lends support to Commercial’s position. The issue to be decided in arbitration in Schulman was H & H’s liability to Olin, an issue that would not be reached until Olin was first found, in litigation, to be liable to Schul-man. In the court’s words: “Olin’s concerns about arbitration will disappear, of course, if Sehulman’s claims against it fail at the trial. In such a case, there would be no liability among Olin and its subcontractors to be resolved and, accordingly, no need for arbitration. If Schulman succeeds in its claims against Olin, only the question of H & H’s liability to Olin will remain undecided after the trial; that question will not have been before the trier of fact.” 458 F.Supp. at 187 n. 4.

Unlike Schulman, in which the need for arbitration turned on the outcome of the litigation, in the case before us the need for litigation against Commercial’s subcontractors depends on the outcome of the arbitration between Fairways and Commercial. Thus, Schulman stands for the unremarkable proposition that if the issue subject to arbitration is severable from the issue to be litigated, the stay need only encompass the severable issue. But, as should be apparent by now, central to the arbitration between Fairways and Commercial is an issue which is not severable from the issue in the litigation against Commercial’s subcontractors.

Such is not the case, however, in respect to Fairways’ action against C.A.L. Engineering Corp., the design engineer. The issue between them is whether the plans and specifications for the building project were properly designed. No matter how the issue in arbitration between Fairways and Commercial is resolved, its resolution has no effect upon the issue between Fairways and the design engineer. Thus, the arbitrable issue, although not severable from the issue in the action against Commercial’s subcontractors, is severable from the issue in the action against the design engineer. Since Section 682.03(3) expressly provides that “if the issue is severable, the stay may be with respect thereto only,” no stay was required of the litigation between Fairways and the design engineer. Accordingly, Commercial’s petition seeking review of the trial court’s order lifting the stay as to all defendants is denied in part and granted in part. The petition is denied in respect to the defendant C.A.L. Engineering, the design engineer. The petition is granted in respect to all defendants who are subcontractors of Commercial, and the order lifting the stay as to these defendants is vacated with directions to reinstate the stay as to them.

. Procedurally, the trial court lifted a stay of proceedings against all non-arbitrating defendants which anomalously had been in effect while the case wended its way through the appellate courts.

. Review was sought by a “Motion to Compel Compliance With Appellate Writ and Mandate.” While we do not find that the trial court departed from our earlier opinion, we do find that its order departed from the essential requirements of the law. Thus, we treat Commercial’s motion to compel as a petition for writ of certiorari.

.Title 9, United States Code, Section 3 provides in pertinent part:

“[U]pon being satisfied that the issue involved in such suit or proceeding is referable to arbitration under such an agreement, [the court] shall on application of one of the parties stay the trial of the action until such arbitration has been had in accordance with the terms of the agreement, ...”

Cases With Similar Vibessemantic neighbors from the corpus


Citator

Cited By (12 total)

  • William I. Sabates, M.D. v. Int'l Med. Ctrs., Inc., 450 So. 2d 514 (Fla. 3d DCA 1984)
    …of the arbitrable claims will have no effect upon the claims pending in court, then the issue in arbitration is severable, and a stay of the claims pending in court is not required. See Post Tensioned Engineering Corp. v. Fairways Plaza Associates, 429 So. 2d 1212 (Fla. 3d DCA 1983). We have little difficulty concluding that the claim against International Hospital for interference is totally independent of the claims against IMC in arbitration. Whether or not IMC is found to have breached its contract with…
  • Bachus & Stratton, Inc. v. Mann, 639 So. 2d 35 (Fla. 4th DCA 1994)
    …nn had no claim against defendants Bachus & Stratton Securities, Inc., Lanza and Love would obviously preclude the successful litigation of these claims against Bachus & Stratton, Inc. See Post Tensioned Engineering Corp. v. Fainvays Plaza As-socs., 429 So. 2d 1212, 1214 (Fla. 3d DCA 1983). Bachus & Stratton Securities, Inc., and Richard Love contend the trial court erred when it held only Mann’s claims against them which occurred before the termination of her employment were arbitrable. In her brief, Mann ci…
  • Cuevas v. Potamkin Dodge, Inc., 455 So. 2d 398 (Fla. 3d DCA 1984)
    …between the issues in the two proceedings or the order in which they should be tried. See Post Tensioned Engineering Corp. v. Fairway Plaza Associates, 412 So. 2d 871 (Fla. 3d DCA 1982), rev. denied, 419 So. 2d 1197 (Fla.1982), appeal after remand, 429 So. 2d 1212 (Fla. 3d DCA 1983). . Ms. Cuevas has proceeded on an "all-or-nothing" basis both in the trial court and on appeal and had made no contention that she may be entitled only to that portion of the fees relating to her lawyer's attempt to enforce the a…

Previewing 3 of 12 citing cases — full citator treatment, depth of discussion, and citing context are member features.

Join FLexlaw to unlock all legal intelligence

Authorities Cited

Full citator, related cases, and AI research tools

Open in FLexlaw