DEPARTMENT OF TRANSPORTATION, APPELLANT,
v.
WHITE CONSTRUCTION COMPANY, INC., A FLORIDA CORPORATION, WHITE CONSTRUCTION COMPANY, INC., DOING BUSINESS AS DUNN ENTERPRISES, INC., AND AETNA CASUALTY AND SURETY COMPANY, A CONNECTICUT CORPORATION, APPELLEES

Fla. 1st DCA | 1984-04-26
No. AX-153
ERVIN, C.J., and THOMPSON and WIG-GINTON, JJ., concur.
452 So. 2d 33 Florida District Court of Appeal, First District (1984) Positive Treatment
Cited by 6 cases

AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.

Synopsis

The Department of Transportation sought to dismiss a counterclaim filed by White Construction Company based on sovereign immunity and a two-year statutory limitation period. The court held that the two-year limitation in Florida's sovereign immunity waiver statute is a condition precedent to bringing suit, not merely an affirmative defense, and must be specifically alleged in the complaint or counterclaim.


Holding

The two-year limitation period in § 337.19(2) is a condition precedent to the waiver of sovereign immunity, not a standard statute of limitations, and therefore must be specifically alleged in the complaint or counterclaim to comply with the requirements established in Levine v. Dade County School Board. White's counterclaim fails to allege compliance with this condition precedent.


Headnotes

[1] A statute imposing a time limitation as a condition precedent to the waiver of sovereign immunity must be specifically alleged as complied with in a complaint or counterc…

[2] A two-year limitation period within a statute waiving sovereign immunity for contract actions against the Department of Transportation is a condition precedent to suit, n…

Previewing 2 of 5 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.

Join FLexlaw to unlock all legal intelligence

Key Quotes

“the limitation is not a limitation of action such as those contained in Chapter 95, Fla.Stat., but is a condition precedent to the waiver of sovereign immunity and the right to bring a contract action against DOT”

Establishes the critical distinction between ordinary statutes of limitations and the statutory limitation in the sovereign immunity waiver statute

Previewing 1 of 3 key quotes on this case — the court’s exact language, pinpointed for members.

Join FLexlaw to unlock all legal intelligence

Facts & Procedural History

In October 1974, White's predecessor contracted with DOT to construct a portion of Interstate 10. Work was completed around August 1979 and accepted i…

The full statement of facts, procedural history, and disposition for this case are member content.

Join FLexlaw to unlock all legal intelligence

© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.


Opinion of the Court
PER CURIAM.

PER CURIAM.

The Department of Transportation (DOT) timely filed a petition for writ of certiorari from the trial court’s order denying its motion to dismiss the counterclaim filed by the respondent White Construction Company, Inc. (White). The petition for certiorari is granted and the trial court’s order denying the motion to dismiss the counterclaim is quashed.

On October 29, 1974, one of White’s corporate predecessors contracted with DOT to construct a portion of Interstate 10. In October 1983, DOT sued White to recover approximately $136,000 it had allegedly overpaid White. White filed an answer and a counterclaim seeking damages for alleged breach of contract by DOT. DOT moved to dismiss the counterclaim on grounds that it was barred by sovereign immunity. The trial court denied DOT’s motion to dismiss the counterclaim.

DOT filed a “Petition for Writ of Prohibition and/or Writ Certiorari,” which this court treated as a petition for writ of certiorari and entered an order for White to show cause. White filed a response and DOT a reply to the response.

DOT alleged in its complaint below that work on the contract was complete on or about August 20, 1979. White denied this allegation in its answer and did not allege in its counterclaim the date on which it contended work on the contract was complete. In its response to the order to show cause White alleged that construction work was finished in August 1979 and accepted by DOT in December 1979. In its reply to the response, DOT agreed with those dates of completion and acceptance.

The waiver of sovereign immunity which permits the bringing of contract actions for work done against DOT is set out at § 337.19, Fla.Stat., which provides:

337.19 Suits by and against department; limitation of actions; forum.—

(1) Suits at law and in equity may be brought and maintained by and against the department on any claim under contract for work done; provided, that no suit sounding in tort shall be maintained against the department.

(2) Suits against the department under this section can only be commenced within 2 years from and after the time of the completion of the work done.

(3) All actions and suits brought against the department after July 9, 1969, shall be brought in the county or counties where the cause of action accrued or in Leon County.

In his order denying DOT’s motion to dismiss, the trial judge found that this two-year limitation of subsection (2) was an affirmative defense which must be asserted in accordance with Rule 1.110(d), Fla.R.Civ.P. DOT contended the two-year limitation was a condition precedent to the bringing of a contract action for work done against it and that compliance with this condition must be specifically alleged in a complaint or counterclaim. We agree with DOT’s contention. Normally a statute of limitations is an affirmative defense which must be pled as an affirmative defense and there is no necessity for an allegation in a complaint or counterclaim of facts to demonstrate that the statute of limitations has not expired. However, in this case the limitation is not a limitation of action such as those contained in Chapter 95, Fla.Stat., but is a condition precedent to the waiver of sovereign immunity and the right to bring a contract action against DOT. It appears from the record that the trial judge did not have the benefit of the Supreme Court’s decision in Levine v. Dade County School Board, 442 So. 2d 210 (Fla.1983) which controls here and which was decided only a few weeks before the entry of his order. Levine holds that conditions precedent in a waiver of sovereign immunity statute must not only be complied with before a suit may be maintained, but also the complaint must specifically allege compliance with the conditions precedent.

The record suggests that the time for filing a contract action against DOT on the contract in question had expired and that the counterclaimant cannot fulfill the time requirement. If that is true, the trial court would have no alternative but to dismiss the counterclaim with prejudice. However, the facts in the record do not conclusively establish the date that work under the contract was completed.

The petition for certiorari is granted. The order denying DOT’s motion to dismiss is quashed and the case is remanded for further proceedings consistent with this opinion.

ERVIN, C.J., and THOMPSON and WIG-GINTON, JJ., concur.


Cases With Similar Vibessemantic neighbors from the corpus


Citator

Cited By

  • City OF Gainesville v. State, 778 So. 2d 519 (Fla. 1st DCA 2001)
    …nold v. Shumpert, 217 So. 2d 116, 120 (Fla.1968) (holding that in “suing a county a plaintiff must allege in his complaint the specific methods by which the county waives its sovereign immunity”). See also Department of Transp. v. White Constr. Co., 452 So. 2d 33, 34-35 (Fla. 1st DCA 1984) [*531] (recognizing “that conditions precedent in a waiver of sovereign immunity statute must not only be complied with before a suit may be maintained, but also the complaint must specifically allege compliance with the c…
  • White Constr. Co., Inc. v. State, 860 So. 2d 1064 (Fla. 1st DCA 2003)
    …y agreed to waive sovereign immunity on the condition precedent that suit be brought within 820 days, section 337.19 should be interpreted as a limited sovereign immunity statute. See Department of Transportation v. White Construction Company, Inc., 452 So. 2d 33 (Fla. 1st DCA 1984). While such an interpretation may have been correct before the decision in Pan-Am Tobacco Corp. v. Department of Corrections, 471 So. 2d 4 (Fla.1984), the argument no longer has any continuing validity. Under Pan-Am, the state ha…
  • Grading & Bush HOG Servs., Inc. v. Fla. Dep't of Transp., 894 So. 2d 1047 (Fla. 5th DCA 2005)
    …y agreed to waive sovereign immunity on the condition precedent that suit be brought within 820 days, section 337.19 should be interpreted as a limited sovereign immunity statute. See Department of Transportation v. White Construction Company, Inc., 452 So. 2d 33 (Fla. 1st DCA 1984). While such an interpretation may have been correct before the decision in Pan-Am Tobacco Corp. v. Department of Corrections, 471 So. 2d 4 (Fla.1984), the argument no longer has any continuing validity. Under Pan-Am, the state ha…