BECHTEL POWER CORPORATION, PETITIONER,
v.
SECRETARY OF LABOR, RESPONDENT

8th Cir. | 1977-01-25
No. 76-1365
548 F.2d 248 United States Court of Appeals for the Eighth Circuit (1977) Caution
Cited by 12 cases

AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.


Holding

The court held that Bechtel, as construction manager responsible for safety, was subject to construction standards under OSHA, even if its employees did not perform manual labor.


Facts & Procedural History

Bechtel, a construction manager, was found responsible for employee exposure to safety violations on a power plant construction site. Bechtel argued i…

The full statement of facts, procedural history, and disposition for this case are member content.

Join FLexlaw to unlock all legal intelligence

© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.


Opinion of the Court
PER CURIAM.

PER CURIAM.

Bechtel Power Corporation (Bechtel) seeks review of a final order of the Occupational Safety and Health Review Commission. The Commission found Bechtel responsible for the exposure of its employees to five non-serious violations of § 5(a)(2) of the Occupational Safety and Health Act of 1970, (OSHA), 29 U.S.C. § 654(a)(2), on a construction site at Crystal City, Missouri, where Bechtel was the construction manager for the building of a power plant.

On its petition for review Bechtel contends that it is not subject to the construction standards of 29 C.F.R. §§ 1926 et seq. since its employees were not performing the actual work of construction and therefore were not “engaged in construction work” within the meaning of 29 C.F.R. § 1910.-12(a). Under its contract with the owner Union Electric, Bechtel was responsible for the administration and coordination of all phases of the construction including the safety program. In fulfilling these responsibilities Bechtel’s employees worked in a managerial or supervisory capacity and did not perform the actual ^ work of construction. The Commission held that since Bechtel’s functions as construction manager were “an integral part of the total construction,” it was “engaged in construction work” within the meaning of the regulations.

Bechtel contends that this result is contrary to the definitions of “employer” and “employee” applicable to the construction standards. 29 C.F.R. §§ 1926.32(a), (i) and (j). The Commission held that the Secretary of Labor’s adoption of the construction standards prescribed in 29 C.F.R. §§ 1926 et seq. as the OSHA standards did not include the definitional sections relied on by Bechtel. 29 C.F.R. §§ 1910.11(b) and 1910.-12(c).

In seeking reversal of the Commission’s decision Bechtel further relies upon the Seventh Circuit’s decision in Anning-Johnson Co. v. OSHRC, 516 F. 2d 1081 (7th Cir. 1975). In Anning-Johnson the court held that subcontractors on a multi-employer construction site were not liable for the exposure of their employees to non-serious violations which the subcontractors “neither created nor were responsible for pursuant to their contractual duties.” Id. at 1082. The Commission factually distinguished Anning-Johnson by noting that Bechtel, unlike a subcontractor, was contractually responsible for the construction site’s safety program and thus possessed the power to protect its employees.

We find the Commission’s application of the Occupational Safety and Health Act correct and its holding otherwise supported by substantial evidence on the record as a whole. We sustain the Commission’s decision on the basis of its written opinion.


Cases With Similar Vibessemantic neighbors from the corpus


Citator

Cited By

Previewing 3 of 5 citing cases — full citator treatment, depth of discussion, and citing context are member features.

Join FLexlaw to unlock all legal intelligence

Authorities Cited

Full citator, related cases, and AI research tools

Open in FLexlaw