GULF POWER CO., APPELLANT,
v.
PUBLIC SERVICE COMMISSION, APPELLEE; LEISURE PROPERTIES, LTD., APPELLANT, V. PUBLIC SERVICE COMMISSION, APPELLEE
AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.
The court held that the Public Service Commission (PSC) did not err in awarding a rural electric cooperative the right to serve a new subdivision, finding the investor-owned utility's expenditures to be an uneconomic duplication of facilities.
[1] A Public Service Commission may grant a utility the right to serve a new subdivision based on the cost of reaching the subdivision, even if those costs are not explicitly…
[2] The Public Service Commission has jurisdiction to prevent uneconomic duplication of electrical facilities.
Previewing 2 of 5 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.
Join FLexlaw to unlock all legal intelligenceGulf Power, an investor-owned utility, and Gulf Coast, a rural electric cooperative, both sought to serve a new subdivision. Gulf Power incurred subst…
The full statement of facts, procedural history, and disposition for this case are member content.
Join FLexlaw to unlock all legal intelligence© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.
Explore caselaw by topic → Browse Public Service Commission Jurisdiction cases and more on FLexlaw
ADKINS, Justice.
Gulf Power Co. (Gulf Power) and property owner Leisure Properties, Ltd., appeal a final order of the Public Service Commission (PSC) granting Gulf Coast Electric Cooperative (Gulf Coast), the right to serve a new subdivision in Washington County. P.S.C. order 13,668 (Sept. 10, 1984). We have jurisdiction. Art. V, § 3(b)(2), Fla. Const. Gulf Power, an investor-owned utility, and Gulf Coast, a rural electric cooperative, each sought to provide electrical service to Leisure Lakes, a 2,300 acre subdivision containing 750 lots. In October of 1983, Gulf Coast filed a petition with the PSC seeking resolution of the territorial dispute. After the filing of the petition, Gulf Power spent about $200,480 extending 2.2 miles of power line to reach the subdivision and building a substation necessary to meet the subdivision’s projected power needs.
The PSC found, in contrast, that Gulf Coast’s costs to provide similar service amounted to about $27,000. The large cost differential was based principally on the proximity of Gulf Coast’s existing facilities to the subdivision. Prior to any construction, the utility had two separate lines within 100 and 250 feet of the subdivision.
The PSC found Gulf Power’s relatively extravagant expenditures in providing service reckless and irresponsible, as well as an uneconomic duplication of electrical facilities prohibited by section 366.04(3), Florida Statutes (1983). The PSC therefore awarded the right to serve the subdivision to Gulf Coast.
Gulf Power hotly contests the PSC’s reasoning and conclusion. While acknowledging that the Commission’s decisions may be overturned upon review only if found to be a departure from the essential requirements of law, unsupported by competent and substantial evidence, Shevin v. Yarborough, 274 So. 2d 505 (Fla.1973), Gulf Power argues that the PSC’s analysis was so arbitrary and erroneous as to fit within these criteria. We disagree, and affirm the PSC’s decision in this case.
Gulf Power contends that the PSC erred in focusing its analysis upon the utilities’ respective costs, and additionally failed to properly apply certain statutory criteria enumerated in section 366.04(2)(e) as properly bearing on the resolution of such a territorial dispute.
We find, to the contrary, that the PSC conscientiously and correctly applied relevant criteria, and that Gulf Power’s attacks on the PSC’s analysis represent a thinly veiled attempt to have this Court reweigh and reevaluate the evidence presented to the PSC. This we cannot do. Polk County v. Florida Public Service Commission, 460 So. 2d 370 (Fla.1984).
Prior to examining the PSC’s analysis, it may be useful to highlight the issues presented to the PSC for resolution. First, the PSC’s determination was bottomed on a number of crucial stipulations: that both utilities were capable of serving the' development, that neither had served the disputed area in the past, and that each utility’s cost to provide service within the subdivision would be approximately equal. The principal question before the PSC, therefore, concerned the utilities’ respective costs in reaching the subdivision.
While such costs are not among those factors specifically enumerated in section 366.04(2)(e), Florida Statutes (1983), as properly bearing on the resolution of a territorial dispute between utilities, the statutory list does not purport to be exclusive. Additionally, section 366.04(3), Florida Statutes (1983), grants the PSC jurisdiction over the development of Florida’s utility service in order to avoid uneconomic duplication of electrical facilities. In view of the considerable cost differential found by the PSC, and the previous proximity of Gulf Coast’s lines to the subdivision, we cannot disagree that Gulf Power’s construction constituted a statutorily proscribed uneconomic duplication of facilities.
As we noted in Gulf Coast Electric Cooperative, Inc., v. Florida Public Service Commission, 462 So. 2d 1092, 1095 (Fla.1985), “[wjhether this constitutes wrongful behavior by either party is beside the point; it is within the discretion of the Commission to refuse to condone it.” We have carefully reviewed a number of alleged errors in the Commission’s reasoning and calculation, and find that in each case the Commission’s findings were based on substantial and competent evidence. We de- dine Gulf Power’s invitation to recalculate and reweigh the evidence properly presented .to the PSC.
Finally, we reject Gulf Power’s contention that our decision of Escambia River Electric Cooperative, Inc. v. Florida Public Service Commission, 421 So. 2d 1384 (Fla.1982), mandates a different result in this ease. Escambia River merely held that when no “factual or equitable distinction exists in favor of either utility ... the territorial dispute is properly resolved in favor of the privately owned utility.” 421 So. 2d at 1385.
Since the record in this case is replete with findings by the PSC establishing several distinctions in Gulf Coast’s favor, our holding in Escambia River has no applicability to the case. Finding no abuse of discretion in either the PSC’s findings or its conclusion, we affirm the order below granting Gulf Coast the right to serve Leisure Lakes.
It is so ordered.
BOYD, C.J., and OVERTON, MCDONALD, EHRLICH and SHAW, JJ., concur.
Cases With Similar Vibessemantic neighbors from the corpus
Citator
Cited By
-
Gulf Coast Elec. Coop., Inc. v. Clark, 674 So. 2d 120 (Fla. 1996)…rtions, this Court must determine whether the order complained of meets the essential requirements of law and whether there is competent, substantial evidence in the record to support the Commission’s findings. Gulf Power Co. v. Public Serv. Comm’n, 480 So. 2d 97 (Fla.1985); Citizens v. Public Service Comm’n, 464 So. 2d 1194 (Fla.1985). Based upon the unrefuted facts and the Commission’s own findings, we conclude that the Commission erred in failing to consider customer preference and abused its discretion i…1 / 2
-
W. Fla. Elec. Coop. Ass'n, Inc. v. Jacobs, 887 So. 2d 1200 (Fla. 2004)…ive Code as though this property and customer had never before received electric service. Under Florida law, the PSC is not limited in its analysis to the specifically enunciated factors of Rule 25-6.0441(2). See Gulf Power Co. v. Pub. Serv. Comm’n, 480 So. 2d 97, 98 (Fla.1985); § 366.04, Fla. Stat. (2001). In turn, the majority of this Court now approves the action taken by the PSC, inflexibly refusing to recognize any consideration outside of those detailed with particularity in the Code. As concluded by…1 / 2
-
LEE Cnty. Elec. Coop. v. Marks, 501 So. 2d 585 (Fla. 1987)…e the allegations demonstrated no violation of the territorial agreement. We must disagree. Although it is not the proper role of this Court to reweigh or reevaluate evidence [*587] presented to the PSC, Gulf Power Co. v. Public Service Commission, 480 So. 2d 97 (Fla.1985); Polk County v. Florida Public Service Commission, 460 So. 2d 370 (Fla.1984), we may examine the record to determine whether the order complained of meets the essential requirements of law. Florida Power Corp. v. Public Service Commission…1 / 2
Previewing 3 of 4 citing cases — full citator treatment, depth of discussion, and citing context are member features.
Join FLexlaw to unlock all legal intelligenceAuthorities Cited
- Shevin v. Jess Yarborough, 274 So. 2d 505 (Fla. 1973)
- Polk Cnty. v. Fla. Pub. Serv. Comm'n, 460 So. 2d 370 (Fla. 1984)
- Gulf Coast Elec. Coop., Inc. v. Fla. Pub. Serv. Comm'n & Gulf Power Co., 462 So. 2d 1092 (Fla. 1985)
- Escambia River Elec. Coop., Inc. v. Fla. Pub. Serv. Comm'n, 421 So. 2d 1384 (Fla. 1982)