MOORING PRODUCTS CORP. OF FLORIDA, APPELLANT,
v.
GREAT SOUTHWEST FIRE INSURANCE COMPANY, APPELLEE
AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.
Mooring Products Corp. claimed insurance coverage under Great Southwest Fire Insurance Company's policy for property damage to a customer's boat occurring during installation of replacement davit cables. The court affirmed the trial court's grant of declaratory relief denying coverage, holding that the damage did not qualify as a 'completed operations' loss under the policy's specific language.
The court held that the damage was not covered under the policy's 'completed operations' provision because the damage occurred during ongoing installation work, not after completion. The court also held that the trial court correctly determined that the insurance agent was not the agent of the insurer for purposes of policy issuance.
[1] A "completed operations hazard" under an insurance policy includes property damage arising out of operations if the damage occurs after such operations have been complete…
[2] Operations are deemed completed for insurance purposes when all work under the contract is finished, all work at the site is finished, or the portion of the work causing…
Previewing 2 of 6 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.
Join FLexlaw to unlock all legal intelligence“"completed operations hazard" includes bodily injury and property damage arising out of operations or reliance upon a representation or warranty made at any time with respect thereto, but only if the bodily injury or property damage occurs after such operations have been completed or abandoned and occurs away from premises owned by or rented to the named insured.”
Defines the scope of coverage for completed operations, establishing that coverage only applies to injuries occurring after operations are completed
Previewing 1 of 3 key quotes on this case — the court’s exact language, pinpointed for members.
Join FLexlaw to unlock all legal intelligenceMooring Products Corp. was an insured under a policy issued by Great Southwest Fire Insurance Company. The insured or its customer suffered property d…
The full statement of facts, procedural history, and disposition for this case are member content.
Join FLexlaw to unlock all legal intelligence© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.
Explore caselaw by topic → Browse Completed Operations Coverage cases and more on FLexlaw
STONE, Judge.
The appellant-insured claimed coverage for a loss incurred when a boat belonging to one of the insured’s customers was damaged during installation of davit cables. The cables replaced ones that had previously been installed by the insured. The appellee denies coverage, claiming the loss was not covered under the terms of its policy.
The insurance policy in question does not provide general comprehensive liability coverage. However, it does provide insurance for injuries from “completed operations” as follows:
“completed operations hazard ” includes bodily injury and property damage arising out of operations or reliance upon a representation or warranty made at any time with respect thereto, but only if the bodily injury or property damage occurs after such operations have been completed or abandoned and occurs away from premises owned by or rented to the named insured. “Operations” include materials, parts or equipment furnished in connection therewith. Operations shall be deemed completed at the earliest of the following times:
(1) when all operations to be performed by or on behalf of the named insured under the contract have been completed.
(2) when all operations to be performed by or on behalf of the named insured at the site of the operations have been completed, or (3) when the portion of the work out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project.
Operations which may require further service or maintenance work, or correction, repair or replacement because of any defect or deficiency, but which are otherwise complete, shall be deemed completed.
We conclude that the specific language of the insurance contract required the result achieved by the trial court. In essence, it provides that although there is no general liability coverage for injuries occurring during the job in progress, there is coverage for any injuries arising out of the appellant’s operations which are incurred after completion. The policy’s exception for repairs does not convert it into a general liability insurance contract, but simply protects the insured from an insurer’s claim that a job was not completed just because some repair work may remain to be done.
The facts were not in dispute, and the trial court correctly granted the appellee declaratory relief finding that the damage was not covered under the policy. Although there is a question as to whéther this policy interpretation was specifically raised and argued by appellee, in our view the issues framed in the trial court and on appeal are sufficiently broad to permit our construction of the policy terms.
We also hold that the trial court did not err in concluding, as the trier of fact, that the insurance agent was not the agent of appellee for the purpose of the issuance of this policy. This determination was supported by substantial competent evidence. Birmingham Fire Insurance Company of Pennsylvania v. Moss Manufacturing, Inc., 446 So. 2d 1142 (Fla.3d DCA 1984); General Insurance Co. v. Ramanovski, 443 So. 2d 302 (Fla. 3d DCA 1983).
AFFIRMED. ANSTEAD, J., concurs.
GLICKSTEIN, J., dissents with opinion.
GLICKSTEIN, Judge,
dissenting.
This is an appeal by a davits contractor which the trial court found to be without either of the two types of coverage designated in appellant’s insurance policy — (a) manufacturers’ and contractors’ liability and (b) completed operations.
The claim arose when appellant’s employees replaced standard thirty-five foot cables with forty foot cables at the customer’s request, one month after payment by the customer. The replacement was occasioned by the needs of another party, not the customer, who had rented the customer’s dock where the newly installed davits were located. The other party’s Donzi required the forty foot cable at low tide, which no one involved in the original contract contemplated. The customer did not know the other party had a boat and had ordered the davit installation for his boat.
The claim arose when appellant’s employees, in making the cable replacement, did not know that the boat’s drain plug had been removed; and the inevitable occurred when they lowered the boat into the water. Neither the customer nor the boat owner were present when appellant’s two employees allowed the boat to submerge.
I agree with the trial court’s conclusion upon the issue of liability coverage because of the following exclusion.
This insurance does not apply:
(k) to property damage to (3) property in the care, custody or control of the insured or as to which the insured is for any purpose exercising physical control
In my view, Phoenix of Hartford v. Holloway Corporation, 268 So. 2d 195 (Fla. 4th DCA 1972), is the basis for determination of this initial issue. Accordingly, I would affirm as to that coverage.
I disagree with the trial court’s conclusion upon the issue of coverage under the completed operations portion of the policy. The policy provides:
“completed operations hazard” includes bodily injury and property damage arising out of operations or reliance upon a representation or warranty made at any time with respect thereto, but only if the bodily injury or property damage occurs after such operations have been completed or abandoned and occurs away from premises owned by or rented to the named insured. “Operations” include materials, parts or equipment furnished in connection therewith. Operations shall be deemed completed at the earliest of the following times:
(1) when all operations to be performed by or on behalf of the named insured under the contract have been completed.
(2) when all operations to be performed by or on behalf of the named insured at the site of the operations have been completed, or (3) when the portion of the work out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project.
Operations which may require further service or maintenance work, or correction, repair or replacement because of any defect or deficiency, but which are otherwise complete, shall be deemed completed.
In my view, appellee did not meet its burden of proving non-coverage. Greenway Village South Condominium Associations I, II, III and IV, Inc. v. Roach, 397 So. 2d 954, 956 (Fla. 4th DCA 1981) (terms of a policy will be construed most favorably to insured). In addition to the above recited facts, the customer’s deposition recites repeated references of his conversation with appellant’s owner who described the use of the thirty-five foot cables as a mistake which he would fix. The terms of the contract called for payment of fifty percent of the cost of the work at the start of the job and fifty percent upon completion of the job. The customer stated that he paid for the work in full on August 12, 1982, and that the job was finished at that time, which was nearly a full month prior to the date at which the customer requested that the cables be replaced. This writer recognizes that appellant’s president testified that the cables were neither defective nor deficient.
Upon this second issue, the case was tried in the trial court and briefed here upon one simple point — whether the job was finished. Paragraph fifteen of the Amended Final Judgment recites:
The damage claim for which coverage is sought occurred while operations were being performed by MOORING and while MOORING was at the job site, and before the 40' cables were put to use.
Appellee’s brief is clear that the question at trial and here was limited to the foregoing consideration. The evidence is clear, from the foregoing, that the job was finished; that a third party came onto the scene with a boat with different requirements, and that the forty foot cables were a correction or repair. Accordingly, I find no basis for supporting affirmance.
Cases With Similar Vibessemantic neighbors from the corpus
Citator
Authorities Cited
- State v. Valdes, 443 So. 2d 302 (Fla. 3d DCA 1983)
- Gen. Ins. Co. v. Vladimiro Ramanovski, Sr., 443 So. 2d 302 (Fla. 3d DCA 1983)
- Phoenix OF Hartford v. Holloway Corp., 268 So. 2d 195 (Fla. 4th DCA 1972)
- Greenway Vill. S. Condo. Ass'ns I, II, III v. Roach, 397 So. 2d 954 (Fla. 4th DCA 1981)
- Birmingham Fire Ins. Co. OF Pa. v. Moss Mfg., Inc., 446 So. 2d 1142 (Fla. 3d DCA 1984)