TALMADGE MOORE D/B/A HIGH STANDARD SERVICES, APPELLANT,
v.
JEFFREY CHODOROW, LINDA CHODOROW, RICHARD LATIMER, INDIVIDUALLY, AND LATIMER CONSTRUCTION CORPORATION, APPELLEES

Fla. 4th DCA | 2006-04-12
No. 4D05-939
SHAHOOD and TAYLOR, JJ., concur.
925 So. 2d 457 Florida District Court of Appeal, Fourth District (2006) Positive Treatment
Cited by 7 cases

AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.

Synopsis

Moore, a mold remediation contractor, contracted to rent air scrubbers and dehumidifiers to the Chodorows for $420 per day to control airborne mold. The trial court found Moore materially breached the contract by failing to disclose that his own July 2002 testing showed no airborne mold problem (outdoor mold was 2.5 times higher than indoor levels), failing to properly monitor and place the equipment, and allowing the Chodorows to pay for 300 days of unnecessary rental. The appellate court affirmed, holding the contract language was clear and the breach findings were supported by substantial evidence.


Holding

Yes. The court held that the contract language stating the machines were 'needed to control further damage caused by airborne mold' is clear and unambiguous, and Moore's interpretation conflicted with the plain language he drafted. The trial court's three independent findings of material breach were each supported by competent, substantial evidence: (1) Moore's failure to disclose the July 16, 2002 test results showing no airborne mold problem; (2) failure to properly monitor the equipment; and (3) failure to properly place the equipment.


Headnotes

[1] A contract's clear and unambiguous language is the best evidence of the parties' intent.

[2] A party materially breaches a contract by failing to advise the other party that rented equipment is no longer needed based on test results.

Previewing 2 of 5 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.

Join FLexlaw to unlock all legal intelligence

Key Quotes

“The language used in a contract is the best evidence of the intent and meaning of the parties.”

Establishes the standard for contract interpretation that the trial court applied correctly in reading the contract as written rather than accepting Moore's post-hoc reinterpretation.

Previewing 1 of 3 key quotes on this case — the court’s exact language, pinpointed for members.

Join FLexlaw to unlock all legal intelligence

Facts & Procedural History

In July 2002, the Chodorows discovered water damage and mold in their Florida condo and hired Richard Latimer for repairs. Latimer brought in Moore, w…

The full statement of facts, procedural history, and disposition for this case are member content.

Join FLexlaw to unlock all legal intelligence

© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.


Opinion of the Court
POLEN, J.

POLEN, J.

This appeal arises from an Amended Final Judgment, following a three-day bench trial, finding against appellant Tal-madge Moore d/b/a High Standard Services (hereinafter “Moore”) and in favor of appellees Jeffrey and Linda Chodorow (hereinafter “the Chodorows”), Richard Latimer and Latimer Construction Corporation. We affirm, holding that the trial court did not err in interpreting the contract between the parties and in finding that Moore breached the contract.

Moore sued appellees for breach of contract and unjust enrichment. The Chodo-rows filed an answer, affirmative defenses, and a counterclaim for fraud and rescission. The Latimer defendants also filed an answer and affirmative defenses. The following evidence was adduced at trial.

The Chodorows own an approximately 8,700 square foot, two floor condominium unit in Aventura, Florida. In July of 2002, the Chodorows discovered a water leak in their condo. They called a contractor, Richard Latimer of Latimer Construction Corp.,1 to fix the leak. When Latimer cut a hole in the ceiling to investigate the source of the leak, he discovered mold under the drywall. Over time, mold was discovered in other areas as well.

As Latimer did not have any professional experience in dealing with mold, they hired Moore to guide them in the issues relating to mold in the Chodorows’ home. Latimer told Moore that he did not have any professional experience in dealing with mold. Moore held himself out to be an expert in mold remediation and in the field of dealing with mold problems.2 Moore testified that he was aware that the Cho-dorows were relying on him to test for mold and to recommend solutions to their mold problem.

Moore visited the Chodorows’ home on July 9, 2002, and took some air samples around the home and the outdoor environment, which he sent out to a lab for analysis. Moore also took initial humidity readings showing over 60 percent humidity, which would sustain mold growth. Moore told them that they had a serious mold problem in the house and that, if it was his family, he would move out immediately, which they did. Moore also recommended that the Chodorows rent air scrubbers and dehumidifiers from him.

On July 11, 2002, Moore faxed a contract to Latimer for the rental of two air scrubbers and two dehumidifiers at a total cost of $420 a day. The contract, which was prepared by Moore specifically for the Chodorows, states “[t]hese machines are needed to control further damage caused by airborne mold.” Moore also orally told both Mr. Chodorow and Latimer that the machines were needed to control an existing airborne mold problem in the Chodo-rows’ condo. Also on July 11, 2002, Moore faxed Latimer a hand-written letter stating that the equipment would be monitored one or two times-a day by a Moore employee. Moore also charged the Chodo-rows a daily charge to change the filters. The Chodorows paid Moore for the first ten days that the equipment was at the condominium.

According to both Moore and the expert witnesses at trial, there is always some level of mold naturally present in the air, but the amount of airborne mold is not problematic inside a home unless the level is higher inside the home than in the outside air. The only way to determine whether there are mold spores in the air is to test the air, as mold spores are too small to be seen by the human eye.

On or about July 16, 2002, Moore received the lab results of the air samples that he took at the Chodorows” home on July 9, 2002. The lab results established that 'there were approximately 2.5 times more mold spores in the outdoor air than inside the Chodorows’ home on July 9, 2002, the day that he had told the Chodo-rows that they had an airborne mold problem.

Moore did not tell the Chodorows that the lab test results showed that there was less overall airborne mold inside their home than in the outside air. Instead, Moore reinforced his false representation that the Chodorows had unacceptably high levels of airborne toxic molds in their home in his October 10, 2002 report, discussing “the cause of the amplified levels of airborne toxic molds.” Moore left the equipment in the Chodorows’ home for 300 days, at a charge of $420 per day.

Moore admitted at trial that he did not perform a single test during the 300 days that the equipment was in the Chodorow’s home that showed that the level of mold spores inside the home was greater than the level in the outside air. He did not perform a single test that showed that the air scrubbers had any effect on the air quality in the Chodorows’ home, or that the contents of the Chodorows’ home would have been damaged absent either the air scrubbers or the dehumidifiers. During the entire period that the equipment was in the Chodorows’ home, Moore did not perform a single test of the air in the Chodorows’ home in comparison to the outside air. The Chodorows began to doubt Moore’s expertise by October of 2002 and initiated attempts to hire a new remediator. Dr. Ronald Huggins of URS Corporation inspected the Chodorows’ home in March or April of 2003.3

When Dr. Huggins inspected the Chodo-rows’ home in March or April of 2003, Moore’s equipment was still set up in the home. Upon Huggins’ first visit to the home, he inquired as to what the equipment was for, as he saw no need for it. On Huggins’ second visit to the Chodo-rows’ home in May of 2003, Huggins stated that the equipment should be removed because it was not serving any useful purpose. As a result, the Chodorows told Moore to remove the equipment, which he did on May 7, 2003.

In June of 2003, approximately six weeks after the equipment was removed, Dr. Huggins tested the air inside the Cho-dorows’ home and compared it to the outside air. Those test results established that the air in the Chodorows’ home had a lower mold spore count than in the outdoor air, meaning the home did not have an airborne mold problem in June of 2003.

Dr. Huggins also reviewed Moore’s July 16, 2002, test results and concluded that the home did not have an airborne mold problem at that time either. Huggins testified that Moore did not perform any tests showing that the equipment was necessary to control airborne mold damage or to protect the Chodorows’ furnishings. Huggins testified that the numbers from Moore’s July 9, 2002, test results were “really, really low,” establishing that the Chodorows did not have an airborne mold problem in their home.

Dr. Huggins also testified that Moore’s representation in the contract that the machines were “needed to control further damage caused by airborne mold” and Moore’s subsequent representation in his October 10, 2002 report that there were “amplified levels of airborne toxic molds” in the Chodorows’ home were false. Moreover, Dr. Huggins testified, even if the Chodorows had an airborne mold problem, the equipment Moore rented to them would have been ineffective because Moore failed to properly monitor and properly place the equipment. Finally, Huggins testified that Moore did not, and could not, inhibit mold growth in the Chodorows’ home by attempting to reduce the humidity, as the mold which existed behind and underneath structures in the home was the result of ongoing water intrusion, which would have to be stopped first. Additionally, the Chodorows’ air conditioning system was sufficient to reduce humidity levels in the condo.

At trial, Moore relied on his expert witness, Arcade Dugay, who testified that the equipment Moore rented to the Chodorows was necessary.4

Following the three-day non-jury trial, the trial court entered the final judgment now being appealed. The court found that Moore materially breached his contract with the Chodorows in three ways: (i) failing to advise them that the equipment was not needed as of July 16, 2002, or, at a minimum, failing to tell them that .the testing revealed no airborne mold problem, allowing them to make the decision of whether they wished to continue to rent the equipment; (ii) failing to properly monitor the equipment; and (iii) failing to properly place the equipment. The court held that the Chodorows are relieved from paying any additional rental fee, based on Moore’s material breaches.

The trial court also found that' the Chodorows owed Moore $2,321 plus prejudgment interest for repair work .they acknowledge Moore did in the master bedroom. The court found that Moore should take nothing by way of his claim against the Latimer defendants. Finally, the court found that the Chodorows should recover nothing against Moore for their counterclaims. Moore appealed.

First, Moore argues that the trial court erred in interpreting the contract between the parties. “Construction of a contract is a question of law which an appellate court may consider de novo provided that the language is clear and unambiguous and free of conflicting inferences.” Miller v. Kase, 789 So. 2d 1095, 1097 (Fla. 4th DCA 2001). Moore argues that the trial court incorrectly construed the July 9, 2002 contract to mean that the parties intended for the machines to reduce or eliminate existing airborne mold. He contends that it is clear that the parties’ real intention regarding the formation of the contract was to reduce the level of moisture in the air and to guard against what might happen with regard to the potential release of mold spores in the air. We hold that Moore’s contention regarding the parties’ intention in contracting to rent the equipment is incorrect because it conflicts • with the clear language of the contract, which Moore drafted specifically for the Chodorows. The language used in a contract is the best evidence of the intent and meaning of the parties. Jenne v. Church & Tower, Inc., 814 So. 2d 522, 524 (Fla. 4th DCA 2002); see also Khosrow Maleki, P.A. v. M.A. Hajianpour, M.D., P.A., 771 So. 2d 628 (Fla. 4th DCA 2000) (“It is axiomatic that the clear and unambiguous words of a contract are the best evidence of the intent of the parties. Where contracts are clear and unambiguous, they should be construed as written, and the court can give them no other meaning.”) (citations omitted). The handwritten contractual language for the July 9,-2002 contract to rent the air scrubbers and dehumidifiers states “[tjhese machines are needed to control further damage caused by airborne mold.”5 Therefore, we hold that trial court properly construed the contract as written.

Second, Moore argues that the trial court erred in finding that he breached the contract. Whether a party’s failure to commit certain actions constitutes a material breach of an agreement is reviewed as a question of fact. Haiman v. Fed. Ins. Co., 798 So. 2d 811 (Fla. 4th DCA 2001). Appellate courts “do not, and cannot, reweigh factual findings of trial courts; we only determine if they are legally sufficient to support the judgment.” Crooks v. Atl. Nat’l Bank of Fla., 445 So. 2d 1042, 1042 (Fla. 5th DCA 1984). Additionally, “[a]s an appellate court, we must disregard conflicting evidence and accept the facts in evidence which are most favorable to the party that prevailed below.” Blue Lakes Apartments, Ltd. v. George Gowing, Inc., 464 So. 2d 705, 708 (Fla. 4th DCA 1985).

Here, where the trial court relied upon three independent bases for finding that Moore breached the contract, the appellate court may set aside the trial court’s decision only if Moore meets his burden of demonstrating that all three of these bases were unsupported by competent, substantial evidence. See Research & Design, Inc. v. Heico Corp., 566 So. 2d 290 (Fla. 4th DCA 1990). The court found that Moore materially breached his contract with the Chodorows in three ways: (i) failing to advise them that the equipment was not needed as of July 16, 2002 or, at a minimum, failing to tell them that the testing revealed no airborne mold problem, allowing them to make the decision of whether they wished to continue to rent the equipment; (ii) failing to properly monitor the equipment; and (iii) failing to properly place the equipment. After reviewing the record, we hold that the trial court’s findings are supported by competent, substantial evidence.

Based on the foregoing, the Amended Final Judgment is affirmed.

SHAHOOD and TAYLOR, JJ., concur. . Latimer is a high-end interior contractor who had performed the interior build-out for the Chodorows when they bought the condo.

. Moore is a certified mold remediator and a certified indoor environmentalist. He was n,ot asked and did not testify as to the bases for his certifications.

. Dr. Huggins has a B.S. in Biology, an M.S. in Environmental Biology, an M.P.H. in Environmental Health/Industrial Hygiene, and a Ph.D. in Industrial Hygiene/Toxicology. He has an extensive background and career in assessing air quality and evaluating damage due to water intrusion and mold.

. Dugay does not have a college degree or a resume. He testified that 0.5% of his work is testing for mold contamination and he relies on industrial hygienists to do mold testing. Dugay stated that he spent approximately one hour reviewing the case at the time of the trial. He never visited the Chodorows' home or saw pictures or videos of the home. He did not review any test results or documents, nor did he conduct any tests, before forming his opinion.

. Additionally, there was testimony at trial that Moore also orally told both Mr. Chodo-row and Latimer that the machines were needed to control an existing airborne mold problem in the Chodorows' condo.


Cases With Similar Vibessemantic neighbors from the corpus


Citator

Cited By

  • Covelli Fam., L.P. v. ABG5, L.L.C., 977 So. 2d 749 (Fla. 4th DCA 2008)
    …oting Universal Beverages Holdings, Inc. v. Merkin, 902 So. 2d 288, 290 (Fla. 3d DCA 2005)), review denied, 973 So. 2d 1123 (Fla.2007). The issue of whether an alleged breach is vital or material is reviewed as a question of fact. Moore v. Chodorow, 925 So. 2d 457, 461 (Fla. 4th DCA 2006); Beefy Trail, Inc. v. Beefy King Int’l, Inc., 267 So. 2d 853, 858 (Fla. 4th DCA 1972) (citing 17A C.J.S. Contracts § 630, p. 1268). To constitute a vital or material breach, a party’s nonperformance must “go to the essence o…
  • Chodorow v. Talmadge Moore, 947 So. 2d 577 (Fla. 4th DCA 2007)
    …judge found in favor of Moore. The final judgment reserved jurisdiction to award the Chodo-rows the attorney’s fees and costs incurred in defending themselves against count I. This judgment was appealed by Moore and affirmed. See Moore v. Chodorow, 925 So. 2d 457 (Fla. 4th DCA 2006). In a subsequent motion for fees and costs, the Chodorows asserted (1) that the contract between them and Moore contained a provision requiring the customer to “pay all costs of collection and all costs to enforce the terms of t…
  • Access Ins. Planners, Inc. v. GEE, 175 So. 3d 921 (Fla. 4th DCA 2015)
    …or the running of the statute of limitations in this case is when the “last element constituting” the breach of contract occurred. § 95.031(1), Fla. Stat. (2014). The occurrence of a breach, or breaches, is a question of fact. See Moore v. Chodorow, 925 So. 2d 457, 461 (Fla. 4th DCA 2006) (citing Raiman v. Fed. Ins. Co., 798 So. 2d 811, 812--(Fla. 4th-DCA 2001)). Here, the application of the .statute of limitations is a mixed question of law and fact. “A legal or equitable action on a contract ... not founde…

Previewing 3 of 4 citing cases — full citator treatment, depth of discussion, and citing context are member features.

Join FLexlaw to unlock all legal intelligence

Authorities Cited

Full citator, related cases, and AI research tools

Open in FLexlaw